Family owned & local · Cherry Hill, NJ

Before you sign

How to Compare Siding Quotes Without Getting Fooled.

The 7 line items that tell you whether you are comparing apples to apples.

Side by side

The lowest number is not always the best quote.

Sometimes it is a quote for cheaper material. Sometimes it leaves out house-wrap or soffit work that comes back as ‘unforeseen conditions’ on install day.

Material brand and line.

Not just ‘fiber cement.’ James Hardie HardiePlank — or something else?

Tear-off scope.

Is it a full tear-off or a siding-over-siding install? Siding-over-siding should be a red flag, not a savings.

House-wrap included?

If it is not in the written scope, it is not in the job.

Flashing details.

Window headers, door headers, chimney flashings, roof-to-wall flashings — specified or hand-waved?

Trim.

J-channels, corner posts, fascia replacement, soffit replacement — in or out?

Warranty terms.

Both material and workmanship — in writing, with duration.

Payment schedule.

Deposit, progress, and final payments tied to clear milestones — with every amount and due date stated in writing.

Stop signs

Red flags.

“We will do it over the existing siding.”

That is not a tear-off. It is a short-term cover-up.

“House-wrap is not necessary on this job.”

It is necessary. On every job.

“We will figure out the trim as we go.”

Trim is a line item. In writing. Before signing.

No manufacturer certification for James Hardie.

Hardie's warranty is conditional on correct installation. Ask to see the installer's Hardie training or certification documentation.

Ready for an estimate?

We measure, inspect, and give you honest numbers. No pressure, no obligation.

CallTextSchedule In-Home Estimate